Category Uncategorized

Elevator Shipping and Container Loading: How Units Arrive

Export elevators loaded onto trucks at the BST Express Elevator factory dock

An elevator shipping container is the last stage of an import order and the one that decides whether a lift arrives intact. This guide covers crating standards and ISPM 15, how to choose between 20GP, 40GP and 40HQ, the seven loading steps, lashing and blocking inside the box, the documents that must travel with the shipment, and seven mistakes that turn a clean delivery into an insurance claim.

Notified Body for Elevators: 7 Mistakes Buyers Must Avoid

Notified body for elevators inspection: wiring checked on the electric test bench at the BST Express Elevator works

A notified body for elevators is the organisation that has to assess a lift before it can carry CE marking, and Directive 2014/33/EU offers no self-declaration route. This guide covers the six conformity routes, the Annex III safety components that each need their own certificate, what the on-site final inspection under Annex V actually tests, the documents the installer keeps for ten years, the position in the United Kingdom, and seven mistakes that cost importers money.